Driveway crossover permit in City of Stirling, WA
City of Stirling publishes no vehicle crossing fee that we could find (checked 17 Oct 2026). Phone the council before booking a concreter, and ask for the fee, who applies and how long approval takes.
Checked 17 October 2026.
Crossover installation application (prior approval required)
Example coverage: Leederville WA. The suburb-to-council match is not certain here.
- Fee and fee year
- Fee not published. Allow for application, inspection and any bond separately.
- Who applies
- Confirm whether the owner or an authorised contractor submits.
- Timeframe
- Not published. Do not infer an approval period.
- Council notes, as captured
- City requires prior approval before construction and pays a subsidy for first crossover; page gives no application fee.
Open the City of Stirling page for the current vehicle crossing guidance.
Checked 17 October 2026.
The permit is separate from the concrete. For the concrete, see the driveway cost guide, and for businesses, the Perth list.
Common questions
Do I need a permit for a new driveway in City of Stirling?
If it crosses the footpath or nature strip, you generally do.
Who applies, me or the concreter?
Ask your concreter who is doing it and put it in the quote.
How long does a crossover permit take?
City of Stirling does not publish a timeframe we could find, so ask when you apply.
Why does your table say "not found"?
We list a fee only when it is on a council page we can open. Not found means we could not find one on the date shown.
Spotted an out-of-date fee? Tell us through the correction form with the council link and we will update the row.